GSI Performance Summary Report

Last Month

March 1, 2025, midnight to March 31, 2025, 11:59 p.m.

System-wide

0.0 

Gallons of Runoff Intercepted

Past 12 Months: 0.0 gallons

This is the equivalent of:

0.0 

Bathubs

Past 12 Months: 0.0 bathtubs

0.0 

Rain Barrels

Past 12 Months: 0.0 rain barrels

0.0 

Pounds of Pollutants Kept Out of Waterways

Past 12 Months: 0.0 pounds

1.67 

Inches of Rainfall

Past 12 Months: 0.0 inches

0.0 

Rainy Days

Past 12 Months: 0.0 days

Metered Sites

  • Maple Avenue

    Between Saturday March 01, 2025, 12:00 AM and Monday March 31, 2025, 11:59 PM, this site has captured and cleaned 0 gallons of stormwater runoff on Maple Avenue and helped ensure 0 pounds of pollutants have not gone into our waterways.

    0.0 

    Gallons of Runoff Intercepted

    Past 12 Months: 0.0 gallons

    This is the equivalent of:

    0.0 

    Bathubs

    Past 12 Months: 0.0 bathtubs

    0.0 

    Rain Barrels

    Past 12 Months: 0.0 rain barrels

    0.0 

    Pounds of Pollutants Kept Out of Waterways

    Past 12 Months: 0.0 pounds

    1.81 

    Inches of Rainfall

    Past 12 Months: 0.0 inches

    0.0 

    Rainy Days

    Past 12 Months: 0.0 days

  • Oakwood Batavia

    Between Saturday March 01, 2025, 12:00 AM and Monday March 31, 2025, 11:59 PM, this site has captured and cleaned 164,962.9 gallons of stormwater runoff, reducing combined sewer overflow events in the Nine Mile Run watershed and helping ensure 0 pounds of pollutants have not entered our waterways

    0.0 

    Gallons of Runoff Intercepted

    Past 12 Months: 0.0 gallons

    This is the equivalent of:

    0.0 

    Bathubs

    Past 12 Months: 0.0 bathtubs

    0.0 

    Rain Barrels

    Past 12 Months: 0.0 rain barrels

    0.0 

    Pounds of Pollutants Kept Out of Waterways

    Past 12 Months: 0.0 pounds

    1.61 

    Inches of Rainfall

    Past 12 Months: 0.0 inches

    0.0 

    Rainy Days

    Past 12 Months: 0.0 days

  • River Roots

    Between Saturday March 01, 2025, 12:00 AM and Monday March 31, 2025, 11:59 PM, this site has captured and cleaned 0 gallons of stormwater runoff on Kalida Drive and helped ensure 0 pounds of pollutants have not gone into our waterways.

    0.0 

    Gallons of Runoff Intercepted

    Past 12 Months: 0.0 gallons

    This is the equivalent of:

    0.0 

    Bathubs

    Past 12 Months: 0.0 bathtubs

    0.0 

    Rain Barrels

    Past 12 Months: 0.0 rain barrels

    0.0 

    Pounds of Pollutants Kept Out of Waterways

    Past 12 Months: 0.0 pounds

    1.6 

    Inches of Rainfall

    Past 12 Months: 0.0 inches

    0.0 

    Rainy Days

    Past 12 Months: 0.0 days

  • Swissvale-Hill

    Between Saturday March 01, 2025, 12:00 AM and Monday March 31, 2025, 11:59 PM, this site has captured and cleaned 646,860.2 gallons of stormwater runoff, reducing combined sewer overflow events in the Nine Mile Run watershed and helping ensure 0 pounds of pollutants have not entered our waterways

    0.0 

    Gallons of Runoff Intercepted

    Past 12 Months: 0.0 gallons

    This is the equivalent of:

    0.0 

    Bathubs

    Past 12 Months: 0.0 bathtubs

    0.0 

    Rain Barrels

    Past 12 Months: 0.0 rain barrels

    0.0 

    Pounds of Pollutants Kept Out of Waterways

    Past 12 Months: 0.0 pounds

    1.67 

    Inches of Rainfall

    Past 12 Months: 0.0 inches

    0.0 

    Rainy Days

    Past 12 Months: 0.0 days